WCGC was pre-qualified to provide a proposal for the Sonoma-Marin Area Rail Transit (SMART) CP4 Design-Build Project

WCGC was pre-qualified to provide a proposal for the Sonoma-Marin Area Rail Transit (SMART) CP4 Design-Build Project. Proposals from pre-qualified design-build entities will be due in March 2013. The estimated $100 Million Design-Build Contract is anticipated to be awarded in April 2013.